Approve a panel as a controlled manufacturing arrangement. Review the individual board geometry, support features and separation plan together with assembly needs.

Identify who designs and approves the panel

A fabrication supplier, assembler or customer may prepare the panel drawing. State who owns the design and who can approve changes. A panel optimized for fabrication is not automatically suitable for the intended placement, soldering and separation operations.

Keep the individual board revision visible on the panel drawing. If the assembly panel is revised without changing the bare board artwork, give the panel its own revision so the manufacturing arrangement remains traceable.

Review the individual board boundary

Confirm the finished outline, internal cutouts and features near the edges. Identify which dimensions apply before separation and which apply to the delivered individual board. Check how the separation method affects the relevant edge requirements.

For example, a connector that overhangs the board may conflict with a neighboring board or rail during assembly. Reviewing only the bare outline can miss that interference, so compare the populated mechanical arrangement as well.

Check the process features

  • Board orientation and the number of boards per panel.
  • Rails, tooling features and the intended handling direction.
  • Fiducials and other alignment references requested by the assembler.
  • Tabs, scoring or routed features and the planned separation operation.
  • Component and fixture clearance around the individual boards.
  • How rejected positions or mixed outcomes will be identified.

Use dimensions and explicit notes instead of assuming that all parties use the same panel conventions. Ask the relevant manufacturer to confirm required feature sizes and clearances for the actual equipment and process.

Agree on separation and inspection

State whether assemblies are supplied in panel form or separated before delivery. Identify responsibility for the separation operation and any required post-separation inspection or test. Include handling and packing requirements for the delivered condition.

A successful assembly check before separation does not automatically establish that the separation process caused no damage. Determine the needed verification from the design and product requirements rather than assuming that the operation is inconsequential.

Retain the approved drawing

Archive the panel drawing with the fabrication and assembly package. Resolve supplier suggestions through the same issue process used for other manufacturing questions. On repeat orders, confirm whether the approved panel remains suitable if the fitted population, fixture or process changes.

The panelization overview introduces the options; this approval checklist records the particular arrangement selected for the product.

Move from reading to a build-ready project

Use the fabrication and assembly checklists to prepare drawings, production files and test requirements.

Open the DFM checklist