Write fabrication notes that specify the intended board and its acceptance evidence without contradicting the manufacturing files or adding undefined requirements.
Give the drawing a defined role
The fabrication drawing connects geometry, construction and acceptance requirements. Its purpose is to resolve the decisions that are not fully conveyed by the manufacturing layers. Begin with the board identifier, revision, units, projection or viewing convention and a clear finished-board outline.
Use controlled dimensions where fit matters. A drawing crowded with dimensions copied from every CAD feature can obscure the ones that actually govern connector alignment, mounting or enclosure clearance.
Group requirements by purpose
| Group | Typical question |
|---|---|
| Construction | What material, layer order and finished thickness are required? |
| Conductors and holes | What copper and finished-hole requirements apply? |
| Surfaces | Which finish, mask and legend requirements are intended? |
| Mechanical features | Which datums, tolerances, cutouts and slots control fit? |
| Acceptance | What inspections, tests and records are required? |
A note should identify its scope. If a tolerance applies only to a connector hole pattern, say so rather than applying it to every hole on the board. If a requirement refers to another document, give the document identifier and applicable revision or agreed reference.
Remove undefined adjectives
Instructions such as “high quality,” “tight tolerance” and “fully tested” do not tell the fabricator how to accept the board. Replace them with the actual measurable requirement or the agreed inspection plan. If the requirement has not been selected, keep it as an engineering issue rather than publishing it as a vague drawing note.
For example, “controlled impedance required” needs a corresponding definition of the affected structures, targets and acceptance method. The phrase alone does not specify which tracks the fabricator should treat as controlled.
Check for contradictions
Compare the drawing with the order form, stackup and exported data. Review the finish, thickness and hole descriptions carefully. A legacy note copied from another design can introduce a requirement that is incompatible with the current construction.
Ask for conflicts to be returned as questions. Avoid a general instruction that lets the recipient choose whichever requirement is easiest. Resolve each conflict in the release record and update the source drawing when the decision is permanent.
Make revision changes visible
When the drawing changes, identify the altered requirements and whether the manufacturing data also changed. Retain the prior revision for traceability. Before sending the package, use the DFM checklist to verify that the note set, geometry and files describe the same board.