A four-layer PCB has four conductive copper layers. Those layers may carry signals, power distribution or reference planes according to the design. Four layers do not automatically mean four signal layers, a particular thickness or a faster delivery time.
Start with the layer functions
Identify the intended role of each copper layer and the electrical relationships that depend on the stack. Discuss reference planes and critical geometry with the design engineer. The fabricator can propose a construction, but it should not have to guess the circuit’s requirements.
OSH Park publishes service-specific stack information and guidance for layer ordering. That illustrates why a four-layer service should be treated as a defined construction rather than a generic interchangeable product.
Review the proposed construction
| Stack item | Question to check |
|---|---|
| Copper order | Are top, inner and bottom layers identified correctly? |
| Dielectric spacing | Does the proposed geometry suit the electrical design? |
| Materials | Are the grade and construction acceptable? |
| Finished thickness | Will the board fit its connectors and enclosure? |
| Critical impedance | Are the model and acceptance requirements aligned? |
Make the output package unambiguous
Export all copper layers, drill information, outline and relevant mask and legend data from the same release. Verify the layer order in a viewer and provide a stack drawing. File names alone can be insufficient when a tool uses different conventions for signal and plane layers.
Check that manufacturing notes do not refer to an earlier two-layer or different-thickness design. An inherited note can create a conflict even when the artwork itself is correct. Include a clearly ordered layer list with the final exported files.
Compare suppliers using the accepted stack
Request quotations for the same quantity, finish, construction and inspection scope. If a provider proposes its standard stack, review that as an alternative before treating the price as equivalent.
Material availability can change, so confirm the construction accepted for the actual order. Keep any approved substitution connected to the design revision and assess whether electrical geometry needs to be updated.
Review the first delivery
Check mechanical fit and the agreed manufacturing evidence. For electrical evaluation, preserve the test setup and any assembly changes so results can be interpreted against the actual board.
A clear stack approval makes future orders easier. It also prevents a supplier transfer from becoming an unintended electrical redesign hidden behind the same four-layer label.
Primary reference: OSH Park four-layer service and stack guidance. See the layer stack planning guide.
Move from reading to a build-ready project
Use the fabrication and assembly checklists to prepare drawings, production files and test requirements.
Open the DFM checklist